     Our construction services are guaranteed to prevent any possible defects or mistakes with construction materials before any after delivery to the construction site. This is what is called QA (Quality Assurance) the check if the delivered materials meet the requirements and specifications approved by the client. Moreover, QA is vital to check all items are in comply with agreed standards and avoid having any conflict with the original functionality objectives. After the completion of the project, QC (Quality Control) Engineer is going to visit the site and verify if the construction details match with drawings and technical data received earlier.

Material Quality Assurance

a) Schedule of material as per drawing specification bill of quantity and schedule work (material needed at site) and it will show date needed for approval date of purchasing.
b) A quality control engineers will monitor the material submittals.
c) Technical department will study the specification and drawing and send the technical data with samples to site quality control engineers.
d) The quality control engineer will study the material compare it with the specification of the contract if is required or equivalent and meet requirements he will submit to the consultant for approval.

Site Quality Control

a) The quality control engineer will submit to the consultant a method of statement for each and every activity for approval.
b) The approved method of statement will be given to the site engineer to be followed at site in execution of that activity.
c) When the work is ready, the site engineer will inform the quality control engineer who will inspect the work and if it is as per drawing & specification, he will give request for inspection by consultant making sure that it had been done as per method of statement.
d) A system of inspection request will be established in the site with special inspection requests and pouring cards for each and every activities for approval from consultant.